As required in the Declaration of Covenants, Conditions & Restrictions (CC&Rs) for Providence Arbours, your HOA retains an Architectural Review Committee. This committee serves to approve plans pertaining to (but not limited to): construction, reconstruction, remodeling, alteration, roofing or addition to any structure, building, fence, wall, drive or walkway or exterior color change projects.
FAQs (Frequently Asked Questions):
What types of improvement projects require approval by the Architectural Review Committee? See section 6.2 (Approval of Plans and Architectural Committee) of the CC&Rs for a complete overview of the requirements and the process for working with the committee.
How do I obtain approval from the Architectural Review Committee? You must complete a “Request for Architectural Approval” form and submit the form (with required samples, drawings, etc. as applicable) to Bobbie Kay Miller at CAM (Carolina Association Management). You may download a copy of the form (see below link) or contact Bobbie Kay Miller at CAM.
How long does the approval process take once I submit a “Request for Architectural Approval” form? 30 days from the time that the form, along with all required samples, drawings, etc. are submitted.
Request for Architectural Approval Form:
Download REQUEST FOR ARCHITECTURAL APPROVAL form
or contact:
Bobbie Kay Miller (CAM) / 704-531-6822 / bobbiekay@cam-hoa.com
Architectural Review Committee Members:
Karen Fincher / 704-846-7020 / kfincher@windstream.net
Mark Vance / 704-957-0123 / mvance@wilkinsonandassociates.com
Bob Moser / 704-846-5567 / vsmoser@aol.com
Kathy Fisher / 704-847-6933 / thedix@aol.com



